Calculate deck materials including boards, joists, posts, concrete, fasteners, and stain for your construction project
Building a deck requires careful planning and accurate material calculations. This calculator helps you estimate all the materials needed for your deck project, from structural components like joists and posts to finishing materials like decking boards and stain.
Proper material estimation ensures you purchase the right amount of supplies, avoiding costly delays from material shortages or waste from over-ordering. Understanding the structural requirements and spacing standards is essential for a safe, durable deck.
Pressure-Treated Lumber: Most economical option, naturally resistant to rot and insects. Requires regular maintenance with stain or sealer. Common sizes are 5/4x6 (actual 1" x 5.5") and 2x6 boards.
Cedar or Redwood: Naturally beautiful with excellent weather resistance. More expensive than pressure-treated but requires less maintenance. Ages to a silver-gray patina if left untreated.
Composite Decking: Low-maintenance alternative made from wood fibers and plastic. Higher upfront cost but minimal maintenance. Available in various colors and textures that won't fade, splinter, or rot.
PVC Decking: Premium option with superior durability and stain resistance. Completely synthetic with no wood content. Excellent for high-moisture environments and requires virtually no maintenance.
Joists: Horizontal framing members that support the deck boards. Typically 2x8 or 2x10 lumber spaced 16" on center. Joist size depends on span length and load requirements. Longer spans require larger joists.
Beams: Support the joists and transfer the load to posts. Usually doubled 2x8, 2x10, or 2x12 boards. Beam size depends on the span between posts and the load they must carry.
Posts: Vertical supports that transfer the deck load to the footings. Typically 4x4 or 6x6 pressure-treated lumber. Post size depends on deck height and load. Taller decks require larger posts.
Footings: Concrete foundations that support the posts. Must extend below the frost line to prevent heaving. Typical footing is 12" diameter and 42" deep, requiring about 1.5 bags of concrete mix per footing.
Deck Screws: Use corrosion-resistant screws rated for exterior use. Stainless steel or coated screws prevent rust stains. For deck boards, use 2.5" to 3" screws. Estimate 2 screws per board at each joist crossing.
Joist Hangers: Metal brackets that connect joists to beams or ledger boards. Use hangers rated for your joist size. Each joist requires one hanger at each end, plus special nails designed for joist hangers.
Post Anchors: Connect posts to concrete footings, keeping wood off the ground and preventing rot. Choose adjustable anchors for easier installation and leveling.
Lag Bolts: Heavy-duty fasteners for attaching ledger boards to the house and connecting beams to posts. Use galvanized or stainless steel bolts with washers.
Stain: Protects wood from UV damage and moisture while enhancing appearance. Transparent stains show wood grain, semi-transparent offer more protection, and solid stains provide maximum coverage. One gallon typically covers 200-300 square feet.
Sealer: Clear protective coating that repels water and prevents cracking and warping. Should be reapplied every 1-2 years for optimal protection. Some products combine stain and sealer.
Application: Apply stain or sealer to all wood surfaces, including ends and undersides of boards. Wait for new pressure-treated lumber to dry (usually 3-6 months) before applying finish. Clean deck thoroughly before each application.
Building Codes: Check local building codes for requirements on footing depth, railing height, joist spacing, and beam spans. Most areas require permits for deck construction. Inspections are typically required at footing, framing, and final stages.
Site Preparation: Clear the area of vegetation and level the ground. Mark post locations accurately using string lines and batter boards. Ensure proper drainage away from the house foundation.
Material Delivery: Order materials with 10-15% extra for waste and mistakes. Have materials delivered close to the work area. Store lumber flat and off the ground, covered but with air circulation.
Timeline: A typical 12x16 deck takes 3-5 days for an experienced DIYer. Allow extra time for concrete curing (24-48 hours) before continuing construction. Weather delays are common, so plan accordingly.
Calculate paint needed for rooms
Calculate flooring materials needed
Calculate tiles needed
Calculate concrete needed
Calculate gravel needed for driveways and landscaping
Calculate mulch needed for garden beds and landscaping